the Facilitated kirpichno-concrete laying

STONE WORKS
KAM'JAN_ ROBOTI
KAMENNYJA PRATSY

The Facilitated kirpichno-concrete laying (fig. 55, and, consists of two walls in the thickness 1 / 2 . A brick and the easy concrete stacked between them. Walls connect tychkovymi numbers of a brick and had through everyone three or five lozhkovyh numbers 2 layings. Tychkovye numbers (a diaphragm) can be placed in one plane (fig. 55 see,) and in razbezhku in chessboard order (fig. 55,6 see) depending on the accepted thickness of a brick and had through everyone three or five lozhkovyh numbers 2 layings. Tychkovye numbers (a diaphragm) can be placed in one plane (fig. 55 see, and vrazbezhku in chessboard order (fig. 55 see, 6) depending on the accepted thickness of a wall (380... 680мм). Instead of continuous tychkovyh numbers longitudinal walls can be connected the bricks stacked in longitudinal walls tychkami is not more rare than through two numbers on height and is not more rare than through two bricks, laid by spoons on length of longitudinal walls. A laying apply at building of buildings in height to four floors. Structure of easy concrete choose depending on etazhnosti an under construction building, quality of fillers and cement mark. Walls erect the circles which height is defined by cross-section bandaging of a laying tychkovymi numbers.

 

In the walls which are tied up tychkovymi by numbers, located in one plane (fig. 55 see, a laying begin with tychkovogo a number. Having laid it, spread external verst of a wall on height of two lozhkovyh numbers and after it - internal verst of a wall on the same height. Then fill an interval between walls easy concrete and again put walls to tychkovogo a number. A laying continue in the same sequence. If tychkovye numbers have vrazbezhku (fig. 55 see,) external tychkovuju verst and internal lozhkovuju, then two at first spread external and two internal lozhkovyh a number then fill space between the laid out numbers concrete. Having finished concrete packing in this belt, again deduce on three numbers of a laying, and at first the first put tychkovyj a number, and then two lozhkovyh. Further laying process repeat.

the Facilitated kirpichno-concrete laying: and - at an arrangement tychkov in one plane, - the same, vrazbezhku; 1 - tychkovye numbers, 2 - lozhkovye numbers, 3 - easy concrete

a Fig. 55. The facilitated kirpichno-concrete laying :
And - at an arrangement tychkov in one plane, - the same, vrazbezhku;
1 - tychkovye numbers, 2 - lozhkovye numbers, 3 - easy concrete


all articles from section " Brick ъырфър"

System of bandaging of a laying

Bricklaying Process

Transportation, warehousing, giving and a brick apportion on a wall

Giving, rasstilanie and solution levelling

Ways and sequence of a laying. Kinds rasshivki seams

the Laying of walls and corners

The Laying of columns and piers

the Reinforced bricklaying

The Laying of crosspieces, wells

The Device of deformation seams

The Workplace of masons

The Organization of work of masons

the Stage-by-stage control and requirements to quality of a laying. The general requirements

Features of erection of stone designs in seismodangerous zones

Rules of technical safety