Preparation for installation of sanitary-engineering cabins, liftovyh mines and other volume elements consists in check of the geometrical sizes and integrated approach of the built in equipment.

Preparation of a workplace and installation of volume elements are carried out usually by two assemblers. Before installation of mine of the lift on a workplace submit a box with a solution, and sanitary-engineering cabins - a box with the calcinated sand and roofing felt or roofing material for the waterproofing course device.

Volume elements stropujut according to instructions of the project of manufacture of works chetyrehvetvevymi slings.


all articles from section " Installation works at erection stone чфрэшщ"

the General data and requirements

Assembly mechanisms, adaptations and tools

Acceptance and warehousing of modular designs

Preparation of elements for lifting. Stropovka

Lifting and installation of designs

Installation of the bases and walls of cellars

Installation of modular ferro-concrete elements of brick buildings on a laying course

Installation of large-panel partitions

Installation of overlappings

Installation of sanitary-engineering cabins, a refuse chute, liftovyh mines

Requirements to quality of installation